Year Completed: 2016
Location: New Kingston, PA
This warehouse project included foundation excavation and installation, including stonebase of the 7” interior slab on grade with dock pits, exterior dock aprons, dolly strips, concrete truck turning pavement and train rail pavement, as well as cast in place concrete walls for dock ramps and dock rail.
- 5,700 Lft. continous fooings
- 362 pcs. column footings
- 1.1 million Sqft. 7″ interior slab on grade
- 120 dock pits
- 173,000 Sqft. exterior dock aprons
- 51,000 Sqft. dolly strips
- 60,000 Sqft. truck turning and train rail pavement
- 4,200 Sqft. CIP walls for dock ramps and dock rail