In April, the KDS Concrete crew took on a 20,000 sqft. building addition project at Feesers Cold Storage in Harrisburg, PA. Feesers is installing a new cooler addition to house more product at their existing facility and our team was tasked with all the concrete needs for this project. Our crews tied all the rebar, installed all the footers, framed and poured all the foundation walls with integral piers, set all the anchor bolts, and prepped, placed, and finished the slab on grade. One unique characteristic of the project is the slab on grade was an extended joint floor with only three saw cuts installed in the entire building. Less saw cuts equates to less maintenance costs for the owner over the serviceable lifetime of the project. KDS Concrete completed the entire scope of this fast track project in one month.